Selasa, 19 April 2011

Sprint, LightSquared, Clearwire in Advanced Talks About Infrastructure Sharing

Sprint Nextel is in advanced talks to rent space on its wireless tower network to LightSquared and Clearwire, the Wall Street Journal reports. For LightSquared, the deal accelerates the pace of its national terrestrial network construction.

Sprint will be paid by Lightsquared partly in cash and partly in spectrum, which will allow Sprint to deploy a new 4G Long Term Evolution network without waiting for spectrum auctions or deactivation of its Nextel iDEN network.

Somewhat oddly, given that Sprint relies on Clearwire to build the 4G WiMAX network Sprint is using, the deal also will allow Clearwire to finish national network construction at lower cost, as well.

LTE could become available on 900/1800 MHz in EC by end of 2011

Long Term Evolution could be available in the United Kingdom sooner than many had thought, following a decision by the European Commission to open up existing airwaves used for 2G and 3G devices, making them available for use by LTE devices.

The EC decision states that the 900 and 1800 MHz spectrum must allow use of these frequencies for LTE devices by the end of 2011. So some network operators with spare capacity in those frequency bands could light LTE networks now, without waiting for a spectrum auction.